Universităţi din Timisoara UVT, UPT, UMFT, USAMVBT & private
#21
Postat 27 octombrie 2009 - 22:39
#22
Postat 27 octombrie 2009 - 23:56
#23
Postat 28 octombrie 2009 - 02:56
Chagall, la 27 Oct 2009, 20:53, a spus:
Bogdan BMB nu cred ca va fi de-acord cu tine.
Nu stiu daca am inteles eu bine gluma, adevarul e ca sunt si destul de obosit, in fine ...
Studentii, cel putin de la arh se ataseaza destul de mult de plansele sau / si machetele pe care le face. Am avut machete la care am lucrat si o saptamana de zile de dimineata pana seara. E o lipsa de respect fata de student sa i le arunci sub nas. Cel mai corect mi se pare ca studentul sa primeasca inapoi macheta si sa faca ce crede el de cuviinta. Aici am inteles ca studentii le-ar abandona, la noi deobicei le primim inapoi, doar plansele ramanand in arhiva. O singura data au facut studentii scandal cand a fost (si mai este) scoala in renovare si odata cu santierul muncitorii au aruncat mii de planse laolalta cu molozul.
#24
Postat 29 octombrie 2009 - 12:41
In schimb, cea mare cea mare a ramas in aceeasi situatie. Nici renovata, nici daramata.
#27
Postat 26 noiembrie 2009 - 23:10
#28
Postat 26 noiembrie 2009 - 23:39
#30
Postat 27 noiembrie 2009 - 00:57
PS Acolo din cate stiu sunt 2 proiecte, unul pentru facultatea de teatru si muzica si unul ce apartine universitatii de vest (facultatea de economie parca)
#31
Postat 27 noiembrie 2009 - 00:59
Faculty of Music and Theater - Location
The idea of departure in project design to the Faculty of Music and Drama has been a creation of a complementary volumetrii the two departments, resulting in a unitary and coherent composition of the style. Volumes can be made a positive composition, having to do with something tangible, well defined. Also, another challenge was a turning alveolar space that marks the limits of the two buildings and create a link between them so that they are accessible in parallel with positive composition mentioned above to obtain a composition of open spaces.
Once established composition rules, and functional layout, to have thought the actual buildings, and especially to the possible targeting of the proposed center in the PUZ developed or already exist on the site thus resulting in a correct orientation and a share of volumes justified created in the composition.
New construction located in a site which currently in a social point of view is absent. Their location on the axle of the Castle Mall, pedestrian axis provided in local planning, requires the creation of a building already simbol.Ducand more architectural approach, accepting public open spaces and green areas designed, the building will devein a center for public interest, not only educational, increasing in popularity.
Having to deal with two departments, art, and create green spaces in the complex pietonalele may become rehearsal areas, both as theater and music, leaving room for possibilities of creating links artistic happening.
As corporeity, has imposed an abstract approach, taking into account the theme and context in which the site is located. The possible existence of remains and Austrian fortifications functions justify tectonic final game project and complementary materials. Stone becomes a joint to the ground, treated metallic body, a parallel to abstract bastionare fortifications and last but not least the location of their bodies white, simple linking of the spatial volumes, creating a unitary composition.
With access created pietonalul Unirii Square - Mall becomes a bridge crossing to which access racordeaza complex. Market over which it passes continuous public pedestrian routes on the site for future economic sciences faculties of arts that became an urban exhibition space.
Aceasta postare a fost editata de Bogdan BMB: 27 noiembrie 2009 - 01:00
#32
Postat 27 noiembrie 2009 - 05:26
#33
Postat 27 noiembrie 2009 - 12:26
#34
Postat 27 noiembrie 2009 - 15:33
Are cineva poze cu proiectul facultatii de economie?
#35
Postat 27 noiembrie 2009 - 15:41
Momentan totul este la stadiul de "intentie".
#36
Postat 27 noiembrie 2009 - 16:26
#37
Postat 27 noiembrie 2009 - 17:01
Eu va spun din surse exacte. Momentan tot proiectul se afla in stadiul de studiu de fezabilitate, servicii de consultanta si analiza.
Citeaza
Sursa: http://www.dgmarket....ice.do~3190773#
Iar cine vrea sa participe la licitatie: http://licitatiipublice.clubafaceri.ro/lic.../licitatie.html
Facultatea de Muzica nu se va construi prea curand.
#38
Postat 27 noiembrie 2009 - 17:15
PS Nici eu nu dau 2 bani pe acele petitii, doar ca acolo a fost singurul loc unde am vazut o randare cu proiectul
#39
Postat 27 noiembrie 2009 - 18:05