STP Timișoara Forum: Universităţi din Timisoara - STP Timișoara Forum

Salt la continut

  • (19 Pagini)
  • +
  • 1
  • 2
  • 3
  • 4
  • Ultima »
  • Nu puteti crea un topic nou
  • Nu puteti replica pe acest topic

Universităţi din Timisoara UVT, UPT, UMFT, USAMVBT & private Evaluare topic: -----

#21 Useril este offline   Wegmann 

  • Membru Gold
  • Grup: Membru Gold
  • Postari: 2280
  • Inregistrat: 09 decembrie 08
  • Sexul:masculin
  • Locatia:Erlangen/Nürnberg

Postat 27 octombrie 2009 - 22:39

Postati niste poze, baieti! Sunt convins ca nu doar eu n-am vazut niciodata interiorul fostei cazarmi.
0

#22 Useril este offline   dAImon 

  • Membru activ
  • Grup: Membru Gold
  • Postari: 3882
  • Inregistrat: 25 martie 08
  • Sexul:masculin
  • Locatia:Timisoara

Postat 27 octombrie 2009 - 23:56

AlexIP : cand ai vreme pentru un tur ca ghid? Eu unul sigur sunt interesat sa vad ce e pe-acolo.
0

#23 Useril este offline   Bogdan DS 

  • Membru Senior ***
  • Grup: Membri seniori
  • Postari: 555
  • Inregistrat: 23 aprilie 09
  • Sexul:nespecificat
  • Locatia:Timisoara

Postat 28 octombrie 2009 - 02:56

Vezi postareaChagall, la 27 Oct 2009, 20:53, a spus:

Ok, am inteles aluzia. :P

Bogdan BMB nu cred ca va fi de-acord cu tine. :04:


Nu stiu daca am inteles eu bine gluma, adevarul e ca sunt si destul de obosit, in fine ...

Studentii, cel putin de la arh se ataseaza destul de mult de plansele sau / si machetele pe care le face. Am avut machete la care am lucrat si o saptamana de zile de dimineata pana seara. E o lipsa de respect fata de student sa i le arunci sub nas. Cel mai corect mi se pare ca studentul sa primeasca inapoi macheta si sa faca ce crede el de cuviinta. Aici am inteles ca studentii le-ar abandona, la noi deobicei le primim inapoi, doar plansele ramanand in arhiva. O singura data au facut studentii scandal cand a fost (si mai este) scoala in renovare si odata cu santierul muncitorii au aruncat mii de planse laolalta cu molozul.
0

#24 Useril este offline   AlexIP 

  • Membru autentic
  • PipPipPip
  • Grup: Members
  • Postari: 66
  • Inregistrat: 24 ianuarie 09
  • Sexul:masculin
  • Locatia:forum.softpedia.com

Postat 29 octombrie 2009 - 12:41

Ca veni vorba... una dintre cladirile vechi (era plina de igrasie, tavanul cazut aproape peste tot, etc.. Nici n-am intrat prea mult pe acolo ca imi era frica) era in curs de demolare alaltaieri cand am trecut pe acolo, mai exact asta. <_<

In schimb, cea mare cea mare a ramas in aceeasi situatie. Nici renovata, nici daramata. :)
0

#25 Useril este offline   Chagall 

  • Moderator
  • Grup: Moderatori
  • Postari: 10283
  • Inregistrat: 18 martie 08
  • Sexul:nespecificat

Postat 25 noiembrie 2009 - 16:18

Lucrari de amenajare cale acces (auto si pietonal) la Institutul de cercetari avansate de mediu si la Ringul de Bursa de pe Oituz, langa Facultatea de Arte.

Thumbnail atasat

  • Imagine atasata: DSC_0078x.JPG
  • Imagine atasata: DSC_0083x.JPG
  • Imagine atasata: DSC_0084x.JPG
  • Imagine atasata: DSC_0085x.JPG
  • Imagine atasata: DSC_0086x.JPG

0

#26 Useril este offline   Florin.B RATT 

  • STPT Forum Admin
  • Grup: Admin
  • Postari: 29641
  • Inregistrat: 06 martie 08
  • Sexul:masculin
  • Locatia:RATT

Postat 26 noiembrie 2009 - 22:51

Azi au inceput sa darame gardul de la strada. :coolspeak:
0

#27 Useril este offline   Chagall 

  • Moderator
  • Grup: Moderatori
  • Postari: 10283
  • Inregistrat: 18 martie 08
  • Sexul:nespecificat

Postat 26 noiembrie 2009 - 23:10

Da, pentru ca pe acolo va fi intrarea, iar poarta din spate de langa penitenciar va fi desfintata.
0

#28 Useril este offline   Florin.B RATT 

  • STPT Forum Admin
  • Grup: Admin
  • Postari: 29641
  • Inregistrat: 06 martie 08
  • Sexul:masculin
  • Locatia:RATT

Postat 26 noiembrie 2009 - 23:39

Ok. Am inteles. O sa fie cam nasol de iesit de acolo. (din cauza traficului intens).
0

#29 Useril este offline   Chagall 

  • Moderator
  • Grup: Moderatori
  • Postari: 10283
  • Inregistrat: 18 martie 08
  • Sexul:nespecificat

Postat 26 noiembrie 2009 - 23:49

La fel e si pe Popa Sapca momentan.
0

#30 Useril este offline   Bogdan DS 

  • Membru Senior ***
  • Grup: Membri seniori
  • Postari: 555
  • Inregistrat: 23 aprilie 09
  • Sexul:nespecificat
  • Locatia:Timisoara

Postat 27 noiembrie 2009 - 00:57

Ok, schimba accesul, dar de noul campus cand se apuca? Stie cineva mai multe?

PS Acolo din cate stiu sunt 2 proiecte, unul pentru facultatea de teatru si muzica si unul ce apartine universitatii de vest (facultatea de economie parca)
0

#31 Useril este offline   Bogdan DS 

  • Membru Senior ***
  • Grup: Membri seniori
  • Postari: 555
  • Inregistrat: 23 aprilie 09
  • Sexul:nespecificat
  • Locatia:Timisoara

Postat 27 noiembrie 2009 - 00:59

Asta ar fi facultatea de muzica si teatru, cu cea de economie nu am nici o poza, are cineva asa ceva?

Faculty of Music and Theater - Location

The idea of departure in project design to the Faculty of Music and Drama has been a creation of a complementary volumetrii the two departments, resulting in a unitary and coherent composition of the style. Volumes can be made a positive composition, having to do with something tangible, well defined. Also, another challenge was a turning alveolar space that marks the limits of the two buildings and create a link between them so that they are accessible in parallel with positive composition mentioned above to obtain a composition of open spaces.

Once established composition rules, and functional layout, to have thought the actual buildings, and especially to the possible targeting of the proposed center in the PUZ developed or already exist on the site thus resulting in a correct orientation and a share of volumes justified created in the composition.

New construction located in a site which currently in a social point of view is absent. Their location on the axle of the Castle Mall, pedestrian axis provided in local planning, requires the creation of a building already simbol.Ducand more architectural approach, accepting public open spaces and green areas designed, the building will devein a center for public interest, not only educational, increasing in popularity.

Having to deal with two departments, art, and create green spaces in the complex pietonalele may become rehearsal areas, both as theater and music, leaving room for possibilities of creating links artistic happening.

As corporeity, has imposed an abstract approach, taking into account the theme and context in which the site is located. The possible existence of remains and Austrian fortifications functions justify tectonic final game project and complementary materials. Stone becomes a joint to the ground, treated metallic body, a parallel to abstract bastionare fortifications and last but not least the location of their bodies white, simple linking of the spatial volumes, creating a unitary composition.

With access created pietonalul Unirii Square - Mall becomes a bridge crossing to which access racordeaza complex. Market over which it passes continuous public pedestrian routes on the site for future economic sciences faculties of arts that became an urban exhibition space.

Imagine postata
Imagine postata
Imagine postata

Aceasta postare a fost editata de Bogdan BMB: 27 noiembrie 2009 - 01:00

0

#32 Useril este offline   AlexIP 

  • Membru autentic
  • PipPipPip
  • Grup: Members
  • Postari: 66
  • Inregistrat: 24 ianuarie 09
  • Sexul:masculin
  • Locatia:forum.softpedia.com

Postat 27 noiembrie 2009 - 05:26

Holy shit, tre sa fac poze prin cladirea aia pana nu se transforma intr-un OZN. :coolspeak:
0

#33 Useril este offline   Chagall 

  • Moderator
  • Grup: Moderatori
  • Postari: 10283
  • Inregistrat: 18 martie 08
  • Sexul:nespecificat

Postat 27 noiembrie 2009 - 12:26

Cred ca mai curand se vor realiza investitiile la Facultatea de Economie si Administrarea Afacerilor, in detrimentul Facultatii de Muzica. Facultatea de Muzica este in deficit financiar de ani de zile, iar FEAA contribuie cu cei mai multi bani in bugetul UVT din taxele percepute pe locurile cu taxa.
0

#34 Useril este offline   Bogdan DS 

  • Membru Senior ***
  • Grup: Membri seniori
  • Postari: 555
  • Inregistrat: 23 aprilie 09
  • Sexul:nespecificat
  • Locatia:Timisoara

Postat 27 noiembrie 2009 - 15:33

Ai dreptate, eu sper totusi ca se vor construi si celelalte facultati

Are cineva poze cu proiectul facultatii de economie?
0

#35 Useril este offline   Chagall 

  • Moderator
  • Grup: Moderatori
  • Postari: 10283
  • Inregistrat: 18 martie 08
  • Sexul:nespecificat

Postat 27 noiembrie 2009 - 15:41

Nu cred sa existe vreun proiect in acest sens in momentul de fata.
Momentan totul este la stadiul de "intentie".
0

#36 Useril este offline   Bogdan DS 

  • Membru Senior ***
  • Grup: Membri seniori
  • Postari: 555
  • Inregistrat: 23 aprilie 09
  • Sexul:nespecificat
  • Locatia:Timisoara

Postat 27 noiembrie 2009 - 16:26

Eu am auzit de la cineva din UVT ca era si o petitie pentru constructie a acestei cladiri. Acolo aparea foarte mica o randare cu acel proiect.
0

#37 Useril este offline   Chagall 

  • Moderator
  • Grup: Moderatori
  • Postari: 10283
  • Inregistrat: 18 martie 08
  • Sexul:nespecificat

Postat 27 noiembrie 2009 - 17:01

Petitiile n-au nici o valoare in ziua de azi.

Eu va spun din surse exacte. Momentan tot proiectul se afla in stadiul de studiu de fezabilitate, servicii de consultanta si analiza.

Citeaza

Obiectivul se compune din doua obiecte principale: Extinderea Facultatii de Arte si Design si Constructia Facultatii de Economie si de Administrare a Afacerilor. Obiectele sunt incadrate intr-un ansamblu functional unic sub aspect urbanistic, arhitectural si tehnico-utilitar.


Sursa: http://www.dgmarket....ice.do~3190773#

Iar cine vrea sa participe la licitatie: http://licitatiipublice.clubafaceri.ro/lic.../licitatie.html

Facultatea de Muzica nu se va construi prea curand.
0

#38 Useril este offline   Bogdan DS 

  • Membru Senior ***
  • Grup: Membri seniori
  • Postari: 555
  • Inregistrat: 23 aprilie 09
  • Sexul:nespecificat
  • Locatia:Timisoara

Postat 27 noiembrie 2009 - 17:15

Aha, inseamna ca de aceea era foarte mica randarea, defapt nu era proiectul pentru UVT.

PS Nici eu nu dau 2 bani pe acele petitii, doar ca acolo a fost singurul loc unde am vazut o randare cu proiectul
0

#39 Useril este offline   Florin.B RATT 

  • STPT Forum Admin
  • Grup: Admin
  • Postari: 29641
  • Inregistrat: 06 martie 08
  • Sexul:masculin
  • Locatia:RATT

Postat 27 noiembrie 2009 - 18:05

Gardul e daramat pe o portiune destul de mare (aprox. 100 m), e posibil sa se construiasca mai mult decat o poarta de acces.
0

#40 Useril este offline   Chagall 

  • Moderator
  • Grup: Moderatori
  • Postari: 10283
  • Inregistrat: 18 martie 08
  • Sexul:nespecificat

Postat 27 noiembrie 2009 - 21:57

Extinderea Facultatii de Chimie

Thumbnail atasat

  • Imagine atasata: DSC_0001x.JPG
  • Imagine atasata: DSC_0002x.JPG
  • Imagine atasata: DSC_0003x.JPG

0

Arata acest topic


  • (19 Pagini)
  • +
  • 1
  • 2
  • 3
  • 4
  • Ultima »
  • Nu puteti crea un topic nou
  • Nu puteti replica pe acest topic

2 useri citesc topicul
0 membri, 2 vizitatori, 0 utilizatori anonimi