More than 4 kilometres of green carpet with 2,000 newly planted trees has been constructed in 2017/2018.
That became possible after the motorway was buried underground in a 2.3 kilometre long double stacked tunnel.
The one billion euro project is still ongoing, it will not be finished before 2026.
That became possible after the motorway was buried underground in a 2.3 kilometre long double stacked tunnel.
The one billion euro project is still ongoing, it will not be finished before 2026.
Construcție prin „săpare și acoperire”:
Trafic internațional și național jos, regional și local sus: